Product & finish reference

TUOPU / PRODUCT COLLECTION

Epoxy Floor Paint

A two-component solvent-free epoxy floor coating for industrial workshops, warehouses and garages. A smooth protective finish applied by roller or scraper as part of a specified floor system.

Enquire about this product ↗

Product information

PropertyReference information
Reference packaging20 kg/set
OriginLianyungang, China
Physical formTwo-component
SystemSolvent-free epoxy
Solids content100%
Material consumption0.15–0.20 kg/m² per topcoat
Recommended thickness60–80 μm dry film
ApplicationsIndustrial workshops, warehouses and garages
View full technical information

Technical reference

PropertyReference information
Application methodRoller or scraper
FinishGloss
Drying & cure referenceSurface dry: 6 h; full cure: 48 h
Shelf life12 months
Water resistanceGood (product overview)
StorageKeep sealed in a cool, dry place; follow the label and SDS
Customization & servicesContact TUOPU to confirm project and supply options

Pack sizes are industry references, not confirmed supply specifications. Values come from the supplied product overview; actual consumption, drying and performance depend on the substrate, environment and selected system. Confirm the current label, TDS, SDS and physical sample with TUOPU.

Explore the finish & application

Supplier packaging reference · confirm actual pack size
Coating layer structure · supplier illustration
Application sequence · follow the selected product instructions
Application scenarios · finish reference

Color & finish reference

Screen colors are indicative. Confirm the available grade and final finish with an approved physical sample.

Supplied color and finish reference

Questions buyers ask

How should the two-component material be prepared?

Follow the current product label and technical data sheet for preparation and application. Ask TUOPU to confirm the supplied system before work starts.

Does a solvent-free coating remove ventilation requirements?

No. Maintain ventilation and use the protective equipment specified in the safety data sheet even when using a solvent-free system.

What is the working time?

The overview gives approximately 30 minutes at 25°C. Temperature and batch size affect working time; plan each batch to suit the job.

Is the floor suitable for forklift traffic?

A thin-coat build is intended for lighter duty. Frequent heavy forklift traffic requires a project-specific system, potentially including a thicker mortar layer.

How can local damage be repaired?

Clean and prepare the damaged area. Minor marks may accept a compatible repair coating; deeper damage may need grinding, re-priming and recoating.

Request product information & a quote

Only your name and email are required. We use your details to answer this inquiry. Privacy policy

Leave a message

Contact details

TUOPU

Message TUOPU

Leave your message here. Our team will reply by email.

We use your details to answer this message. Privacy policy